Oborevwori's Infrastructure Drive Gains Momentum in Delta, Says Izeze

 

...As Trans-Warri Access Road Hits 49.5% Completion, Okowa Crescent Nears Finish Line 

The Delta State Government has expressed satisfaction with the steady progress of critical road projects under Governor Sheriff Oborevwori's infrastructure renewal agenda, with the rehabilitation of the first five kilometres of the Trans-Warri/Ode-Itsekiri Bridges access road attaining 49.5 per cent completion and the construction of Okowa Crescent in Ughelli reaching 99 per cent completion. 

Commissioner for Works (Highways and Urban Roads), Comrade Reuben Izeze, disclosed this while inspecting the two projects, describing them as key components of Governor Oborevwori's commitment to delivering durable infrastructure and improving connectivity across the state. 

According to Izeze, the rehabilitation of the five-kilometre access road leading to the Trans-Warri/Ode-Itsekiri Bridges project became necessary following years of heavy usage that left the road in a deteriorated condition despite the completion of major sections of the bridge project. 




He explained that Governor Oborevwori approved the rehabilitation to ensure that residents and visitors enjoy a seamless driving experience from the Refinery Road axis through Ubeji to Ode-Itsekiri. 

"The Governor felt it would not be appropriate to commission a world-class bridge project through a dilapidated access road. That informed the decision to rehabilitate the entire five-kilometre stretch so that the people of Warri, Ubeji, Ode-Itsekiri and neighbouring communities can enjoy smooth and safe transportation," he said. 

The commissioner commended Niger Cat Construction Company, which was awarded the rehabilitation contract in May 2026, for maintaining a satisfactory pace of work and adhering to approved specifications. 

He expressed optimism that the project would be completed before the peak of the rainy season, paving the way for its commissioning by Governor Oborevwori. 

At Okowa Crescent, off the Ughelli/Patani Expressway in Ughelli North Local Government Area, Izeze said the road project, awarded to Obakpor J.U. Construction Limited in September 2025, had reached 99 per cent completion. 

He noted that only minor finishing works and road markings remained before the project would be ready for commissioning. 

"We observed just a few finishing touches that need to be completed. Once those are done and the road markings are installed, the project will be ready for commissioning," he stated. 

The commissioner added that all additional works approved by Governor Oborevwori, including drainage improvements, had been executed according to specifications. 

Speaking during the inspection of the Trans-Warri access road, Special Project Director of the Trans-Warri Road and Bridges Project, Chief Otimeyin Adams, praised the governor for approving the rehabilitation works. 

According to him, the intervention has transformed a previously damaged corridor into a smooth roadway, ensuring that the landmark bridge project can be fully appreciated by commuters and residents. 

Also speaking, Majority Leader of the Warri South Legislative Arm and Trust Assistant Secretary of Ifiekporo Community, Hon. Tuoyo Ebigbeyi, described the Trans-Warri/Ode-Itsekiri Road as a strategic economic asset that would unlock development opportunities, boost agriculture and stimulate investments in the area. 

He commended Governor Oborevwori for ensuring the completion of the project, saying the road would open up new frontiers for economic growth and improve the lives of residents across the riverine communities.

Jokpeme Joseph Omode

Jokpeme Joseph Omode is the founder and editor-in-chief of Alexa News Network (Alexa.ng), where he leads with vision, integrity, and a passion for impactful storytelling. With years of experience in journalism and media leadership, Joseph has positioned Alexa News Nigeria as a trusted platform for credible and timely reporting. He oversees the editorial strategy, guiding a dynamic team of reporters and content creators to deliver stories that inform, empower, and inspire. His leadership emphasizes accuracy, fairness, and innovation, ensuring that the platform thrives in today’s fast-changing digital landscape. Under his direction, Alexa News Network has become a strong voice on governance, education, youth empowerment, entrepreneurship, and sustainable development. Joseph is deeply committed to using journalism as a tool for accountability and progress, while also mentoring young journalists and nurturing new talent. Through his work, he continues to strengthen public trust and amplify voices that shape a better future. Joseph Omode is a multifaceted professional with over a decade years of diverse experience spanning media, brand strategy and development.

Thank you for reaching out to us. We are happy to receive your opinion and request. If you need advert or sponsored post, We’re excited you’re considering advertising or sponsoring a post on our blog. Your support is what keeps us going. With the current trend, it’s very obvious content marketing is the way to go. Banner advertising and trying to get customers through Google Adwords may get you customers but it has been proven beyond doubt that Content Marketing has more lasting benefits.
We offer majorly two types of advertising:
1. Sponsored Posts: If you are really interested in publishing a sponsored post or a press release, video content, advertorial or any other kind of sponsored post, then you are at the right place.
WHAT KIND OF SPONSORED POSTS DO WE ACCEPT?
Generally, a sponsored post can be any of the following:
Press release
Advertorial
Video content
Article
Interview
This kind of post is usually written to promote you or your business. However, we do prefer posts that naturally flow with the site’s general content. This means we can also promote artists, songs, cosmetic products and things that you love of all products or services.
DURATION & BONUSES
Every sponsored article will remain live on the site as long as this website exists. The duration is indefinite! Again, we will share your post on our social media channels and our email subscribers too will get to read your article. You’re exposing your article to our: Twitter followers, Facebook fans and other social networks.

We will also try as much as possible to optimize your post for search engines as well.

Submission of Materials : Sponsored post should be well written in English language and all materials must be delivered via electronic medium. All sponsored posts must be delivered via electronic version, either on disk or e-mail on Microsoft Word unless otherwise noted.
PRICING
The price largely depends on if you’re writing the content or we’re to do that. But if your are writing the content, it is $100 per article.

2. Banner Advertising: We also offer banner advertising in various sizes and of course, our prices are flexible. you may choose to for the weekly rate or simply buy your desired number of impressions.

Technical Details And Pricing
Banner Size 300 X 250 pixels : Appears on the home page and below all pages on the site.
Banner Size 728 X 90 pixels: Appears on the top right Corner of the homepage and all pages on the site.
Large rectangle Banner Size (336x280) : Appears on the home page and below all pages on the site.
Small square (200x200) : Appears on the right side of the home page and all pages on the site.
Half page (300x600) : Appears on the right side of the home page and all pages on the site.
Portrait (300x1050) : Appears on the right side of the home page and all pages on the site.
Billboard (970x250) : Appears on the home page.

Submission of Materials : Banner ads can be in jpeg, jpg and gif format. All materials must be deliverd via electronic medium. All ads must be delivered via electronic version, either on disk or e-mail in the ordered pixel dimensions unless otherwise noted.
For advertising offers, send an email with your name,company, website, country and advert or sponsored post you want to appear on our website to advert @ alexa. ng

Normally, we should respond within 48 hours.

Previous Post Next Post

                     Copyright Notice

All rights reserved. This material, and other digital contents on this website, may not be reproduced, published, rewritten or redistributed in whole or in part without prior express written permission from Alexa News Network Limited (Alexa.ng). 

نموذج الاتصال